
⭐ Special Package Price: 660,000 THB (Net)
Price is negotiable
Equipment can be upgraded or downgraded based on actual site conditions
Micropile foundation is included in the package
Note: Some locations may not require micropiles. Customers may remove or provide their own foundation work depending on soil conditions.
1. Structure Works
Our structural works follow professional engineering standards, ensuring strength, safety, and long-lasting waterproof performance.
Site Preparation & Foundation
Site level measurement and pool layout marking
Installation of 6 micropiles (I22, length 16-21 m)
Cutting pile heads
Excavation, leveling, backfilling, and soil removal
Compact sand bedding
Lean concrete layer
Reinforcement & Concrete Works
DB12 steel reinforcement for floor and walls
Waterproof reinforced concrete for the floor and walls (280 ksc)
Water Stop installation at all joints
Drop concrete on pile heads
Block Work, Formwork & Wall Construction
External block wall construction
Internal steel formwork installation
Drop base block wall construction
Finishing & Tile Works
Natural stone tiles (10 × 10 cm) for floor and walls
Natural stone coping (30 × 30 cm)
Full plastering and waterproof coating
Stainless steel ladder (316 grade, 3 steps)
️ 2. Pool System & Equipment
All equipment is selected for durability, ease of use, and compatibility with long-term pool operation.
Filtration System
Circulation Pump WL-KP 1 HP
LASWIM Sand Filter SDG24" (Top Mount)
EC12 Salt Chlorinator (12 g/hr, for pool 50 m³)
UPVC ball valves, check valves, and filter sand
Control panel (pump + salt system + pool light)
In-Pool Fittings
Emaux Skimmer EM0020-RC
2 × Floor Inlets
2 × Eyeball Jets
Main Drain (ABS Grade A)
Stainless steel junction boxes
Flashing fittings
2 × Slim LED underwater lights (18W, 12V/DC)
Cleaning Equipment
Complete cleaning set
9-meter vacuum hose
2 × 3 m telescopic pole
Waterproof digital salt meter pen
Start-up Chemicals
Chlorine 90%
Sodium bisulfate
Liquid flocculant
Algaecide
Pool salt (25 kg × 5 bags)
️ 3. Installation Works
Piping & Electrical Materials
PVC Class 13.5 pipes & fittings
3/4" PVC conduit for pool light wiring
VCT 2×2.5 sq.mm. electrical cable
Professional Installation
Complete piping inside the pool and to the pump room
Installation of all in-pool fittings
Installation of filtration & salt systems
Initial water balancing
Technician travel & accommodation included
System Testing (Commissioning)
Full testing of pump, filtration, salt system, and lighting
Initial water quality check
Hands-on training for all pool operation functions
Payment Terms
30% upon contract signing
20% after foundation and base reinforcement completion
20% after concrete floor and wall works
20% after tile installation & equipment installation
10% upon system testing and handover
️ Warranty
Pool Structure: 5 Years
Pool System: 2 Years
Equipment: 1 Year
Free system check-up 3 times during the first year
Contact Winwinpool Today
We provide on-site surveys, pool design consultation, equipment customization, and professional recommendations to ensure the perfect pool for your home.


